If one run Arc Flash and use as pre-fault voltage “Load Flow Results”, one should make sure the parameter “Include Transformer Phase Shift”, is set the same way in both Load Flow and Arc Flash, otherwise it could create some mismatch in using the current at the secondary of a transformer that have a phase shift.