- General Support
- Oneline & User Interface
- License Key Issues
- Downloading/Installing Software
- Printing
- Reports
- Equipment Modeling
- DAPPER (Demand Load)
- DAPPER (Load Flow)
- DAPPER (Short Circuit)
- CAPTOR (TCC)
- Arc Flash Evaluation
- Equipment Evaluation
- Cable Ampacity
- A_Fault (ANSI)
- IEC 60909 Fault
- IEC 61363 Fault
- TMS (Transient Motor Starting)
- HI_WAVE (Harmonics)
- Unbalanced/Single Phase
- DC Systems Analysis
- GroundMat
- Cable-3D
- Scenario Manager
- Backup & Import/Export
DAPPER (Load Flow)
-
Parallel Utilities not evenly shared in Load Flow
Updated: Wednesday, July 13, 2016
-
Why is the PF very low in running the Demand Load Study when a Capacitor is added to the system?
-
Initial Voltage for Utility or Swing Bus Generator in Short Circuit Study
-
Initial Voltage for Utility or Swing Bus Generator for Load Flow Study
-
How do I resolve a diverging Solution in the load flow study?
-
If I’m running a LF study (motor impact starting) and my sources are all generators (defined as SB), what source impedance is the LF study options dialog referring too?
-
How is the induction motor startup current multiplication factor calculated in a load flow study?
-
How do I calculate voltage drop across transformer?
-
How do I calculate voltage drop across cable?
-
How do I model a reduced voltage starter when performing an Impact Motor Starting study using the Load Flow?
-
How is the induction motor startup current multiplication factor calculated?
-
VFD Rated Current is less than its loading